The Grant Street Pier
Restaurant Buildings, Rediviva and The Murdock.
Residents are living in the
apartments, customers are dining in the signature restaurants, tenants occupy
Class A office space and the Waterfront park and pier is open to the public.
|
|
|
|
| |
The Grant Street Pier
and plaza opened September 29, 2018 with a Grand Opening celebration of an
estimated 15,000 people in attendance.
|
|
|
|
| |
Grant Street Pier
Restaurants (Blocks 9 & 12)
|
|
|
|
| |
|
|
|
|
|
WildFin American Grill outside seating.
|
|
|
|
|
|
|
WildFin American Grill interior fish bar.
|
|
|
|
|
| |
|
|
|
|
Twigs Bistro and Martini Bar interior.
|
|
|
|
|
|
Twigs Bistro and Martini Bar outside seating.
|
|
|
|
|
| |
|
|
|
|
Maryhill Winery, tasking room, wine club and restaurant,
located adjacent to Twigs Martini Bar and Bistro occupying 4,890 square feet
opened April 13th.
|
|
|
| |
Grant Street Pier, The Hotel Indigo and The Rediviva welcomes
|
|
|
|
| |
|
|
|
|
Barlow’s Public House is under construction in 5,000 square feet above Twigs Bistro and Martini Bar. Opening is expected in August.
|
|
|
|
|
|
The popular Seattle and Portland steakhouse will add a 8,500 square foot restaurant on the main floor and a 1,500 square foot terrace bar on the 8th floor of the Indigo Hotel. Opening October 2020.
|
|
|
|
|
|
|
Stack 571 Burger & Whiskey Bar will occupy just over 3,000 square feet on the main level. Opening June in the Rediviva Building.
|
|
|
|
|
| |
The
Murdock at The Waterfront is proud to announce OnPoint Community Credit Union & Pizzeria Sul Lago
|
|
|
|
| |
|
|
|
|
The largest credit union in Oregon will open a 2,200 sf branch this coming winter on the ground floor. OnPoint has more than 360,000 members in Oregon and SW Washington.
“As we expand our footprint in SW Washington, there was no question that we had to have a branch at The Waterfront Vancouver,” said Tory McVay, senior vice president/chief retail officer & wealth management executive at OnPoint. “This location is truly a landmark for the city of Vancouver and we had to be a part of that excitement.
|
|
|
| |
|
|
|
Pizzeria
Sul Lago will occupy 3,325 square feet on the main level.
|
|
|
| |
Rediviva and The Murdock (Block 6)
|
|
|
|
| |
Rediviva features 63 luxury apartments, in 6 floors, with Stack 571 Burger & Whiskey Bar and Cascade Sotheby’s International interior improvements under construction on the ground level. In the lobby of the Rediviva, artwork is featured by nationally renowned artist Red Wolf from Sausalito California who designed and constructed this metal and acrylic back-lit piece for this location.
|
|
|
| |
The residents in over half of the 63 luxury apartment homes at the Rediviva have moved-in and are enjoying the comforts of their new homes and the outdoor features right outside their door. Stainless steel appliances, double vanities, tile floors, tall windows, quartz countertops, private access, underground parking.
|
|
|
|
| |
The Murdock at The Waterfront is 69,000 square feet in a 7 stories of Class A office space. The M.J. Murdock Charitable Trust, Chicago Tile and Fidelity Title, McKean Smith law currently occupy the building. Other tenant’s interior improvements including Trend Capital Holdings Inc. are now under construction. On the ground level, Pizzeria Sul Lago has been announced and will open in September.
|
|
|
|
| |
Construction continues on the Headwaters Wall educational art installation and water play feature with an anticipated opening of summer 2019
|
|
|
|
| |
|
|
|
RiverWest (Block 8), has 206 apartments and 20,000 square feet of retail under construction. 206 units. Expected completion date June.
For more information, please visit www.riverwest.com
|
|
|
|
|
Featuring 138 rooms and 40 condominiums. The expected delivery date is anticipated mid-2020. For information, please contact Dana Gardner with Indigo Hotel at 360-816-1490 or on their website at www.kirklandtower.com
|
|
|
| |
The
next condominiums at The Waterfront are in the early stages of design. Construction
of approximately 80 units in a 14 story tower is anticipated to begin early
next year with delivery in early 2021.
If you
have submitted a letter of interest or have signed up for updates at
thewaterfrontvancouverusa.com, we have your information on file and as more
information becomes available, we will send out updates and/or update our
website.
|
|
|
|
| |
90’ Cable-Stayed Pier | 1/2 Mile Waterfront Park 270 Apartment Homes | 62,000 SF Class A Office Space | 80,000 SF Retail & Restaurant Space
|
|
|
|
| |